Seward Alaska 2017
Ninilchik Alaska Pearl Pad 2017
Hatcher Pass Road Upgrade-Performed all excavation and culvert pipe installation
Kenai Peninsula Landfill (phase 2)-First leachate recycling landfill in Alaska. Project was completed in 2004.
Ninilchick River Emergency Response- Repaired washouts and culvert pipe, also installed riprap at various locations
Pipeline Haul Road (AKA The Dalton Highway) This connected the road from the South American tip to the North American tip. The only known pictures of this historic event.
Soldonta Urban Project-Performed all excavation and culvert pipe installation and built sediment basin.
Unity Trail Project-Beaver Creek Multiplate on the Kenai Peninsula
Elliott Highway- Minto Alaska 2016